|
History SLC-6, part of Vandenberg's "South Base," was originally part of the Sudden Ranch, prior to its purchase by the U.S. Air Force in the mid-1960s under the law of eminent domain. In addition to the ranch, the Point Arguello lighthouse was based there, which has since then been replaced by an off-shore LORAN tracker. With the purchase of the base, the Air Force started construction of the SLC-6 facility on March 12, 1966 to support launches of a modified Titan III for the Manned Orbiting Laboratory (MOL). After significant construction work was completed, the MOL program was cancelled on June 10, 1969, so further work on SLC-6 stopped as the facility was placed in mothball status. With plans of launching civilian and military equatorial space shuttle flights from Kennedy Space Center (KSC) and military polar orbit flights from Vandenberg, NASA and the Air Force looked at different sites for launching the shuttle, finally deciding upon SLC-6, due to its dedicated manned spaceflight role that was leftover from the cancelled MOL program. In 1972, Vandenberg AFB was chosen as the western launch site for Air Force shuttle launches. Use of SLC-6 was approved in 1975, and re-construction of the former MOL launch facility occurred between January 1979 and July 1986 as SLC-6 was rebuilt to accommodate the space shuttle. There were several reasons for using SLC-6: A Senate report summarized: "The Air Force originally justified the expenditure of such SLC-6 funding on the basis of a need to launch high-priority military payloads into polar orbits. After Defense Department officials testified that polar orbits could not be achieved by launching from Kennedy Space Center in Florida, the Congress initiated construction of....SLC-6." There were significant layout differences between the shuttle launch complexes at KSC and SLC-6 at Vandenberg. KSC had the Orbiter Processing Facility, Shuttle Runway facility, Mate-Demate Device (for loading the Orbiter on the Shuttle Carrier Aircraft), the Vehicle Assembly Building, and Launch Complex 39. SLC-6 consolidated the VAB (stacking) and LC-39 (launching) functions, while a processing facility, located at North Base, handled the vehicle processing, along with providing a Mate-Demate Device, and a 13,000-ft. runway for Shuttle landings. Downfall and demise The Shuttle SLC-6 was declared operational during acceptance ceremonies held on October 15, 1985. However, much additional work and testing was still required. The Space Shuttle Enterprise was used for a series of fit checks like those conducted at LC-39 in 1980. The inaugural polar-orbit flight, designated (STS-62A), and using Space Shuttle Discovery with Shuttle veteran Robert Crippen as commander, was planned for October 15, 1986. However, the Challenger Disaster of January 28, 1986 grounded the Shuttle fleet as efforts were concentrated on recovery and returning the program to flight after a two year hiatus. On July 31, 1986 Secretary of the Air Force Edward C. Aldridge Jr., announced that Vandenberg's space shuttle program would be placed in "operational caretaker status," seven months after the space shuttle Challenger accident. A few months later, however, SLC-6 was placed in "minimum caretaker status" on February 20, 1987. Eventually, on May 13, 1988, Secretary Aldridge then directed the Air Force to transfer space shuttle assets at Vandenberg to other organizations (specifically, the Kennedy Space Center) by September 30, 1989, the end of the fiscal year. The work was completed 10 days early on September 20, 1989 when SLC-6 was placed in mothball status. Several factors accounted for this: The Air Force officially terminated the space shuttle program at Vandenberg on December 26, 1989. The estimated cost for the failed program was $4 billion. However, just six months later on July 6, 1990, Lockheed Space Operations Company (LSOC) was awarded an Air Force ground system contract to modify SLC-6 into a Titan IV/Centaur launch complex — essentially an uprated facility from the original MOL program that would have launched a Titan III vehicle. Site work was scheduled to begin in late fiscal year 1992, and lead to an initial launch capability sometime in fiscal year 1996. However, on March 22, 1991, HQ USAF reversed itself again by announcing the termination of the Titan IV/Centaur program at SLC-6. The reasons given for the project being canceled was due to "insufficient Titan IV launch requirements from the West Coast to support the construction of a new launch pad.". The contract with LSOC was closed out several months later. Rebirth and transition
Redemption and looking forward Boeing developed the Delta IV class of vehicles as its entrant in the Department of Defense's Evolved Expendable Launch Vehicle (EELV) program. The main objective of EELV is aimed at cutting launch costs and simplifying the process of getting satellites into space. Boeing's main competitor, Lockheed Martin, has a similar class of vehicles known as the Atlas V that will make its West Coast debut in early 2007, flying from the modified Space Launch Complex-3 East on South Base. After sitting on the pad since late 2003 and enduring technical issues with both the booster and the payload, the first of the Delta IV launch vehicles to fly from SLC-6 successfully lifted off at 8:33 p.m. PDT on June 27, 2006. The Delta IV Medium+ (4,2) rocket lofted NROL-22, a classified satellite for the National Reconnaissance Office, into orbit. The payload was successfully deployed approximately 54 minutes later. "This first Delta IV launch from Vandenberg is an important achievement for Boeing and our NRO and Air Force customers," said Dan Collins, vice president of Boeing Launch Systems. "Today we successfully validated launching the Delta IV from SLC-6, providing the Air Force and the nation with the first operational West Coast launch site for the EELV program. With this launch, the Delta team has fulfilled all the EELV requirements outlined by the Air Force. We have a full family of launch vehicles, including a flight-proven, heavy-lift vehicle, a domestically produced first stage engine and now fully operational launch sites on both coasts." According to a post-launch Boeing News press release, the mission was the first for the NRO aboard a Delta IV and the second aboard a Delta rocket. The first was the GeoLITE mission in 2001 aboard a Delta II. Launch and mission planners anticipate readying SLC-6 for another Delta IV Medium vehicle that will fly a mission for the Air Force Defense Meteorological Satellite Program, DMSP-17, in late 2006. | ||||||||||||
|
| |||||||||||||
![]() |
|
| |